Pittwater Rooftop Carpark
Delivering a multi-stage rooftop carpark waterproofing solution while maintaining full operations
Scope of works:
- Replacement of the rooftop carpark trafficable waterproofing membrane while ensuring the carpark remained operational.
- Implementation of a German-engineered multi-layer trafficable waterproofing system for long-term durability.
- Crack injections to reinforce and extend the structural integrity of the rooftop surface.
- Releveling of the carpark to eliminate water pooling and enhance drainage performance.
- Special considerations for weather impact due to the open-air nature of the carpark.
- Execution of a multi-staged program to allow continuous access for vehicles and pedestrians.
Year:
RetailLocation:
Mona Vale, NSWDuration:
5 months